![First HVDC transmission line tested with full load of 4,000 MW](https://transform.zgisoft.com/files/pakistan_hvdc-850x400-1-340x210.jpg)
First HVDC transmission line tested with full load of 4,000 MW
Pakistan, Lahore: Pakistan on 14 August launched a trial run of its first high voltage direct current (HVDC) transmission line with the full load of 4,000 MW.
Pakistan, Lahore: Pakistan on 14 August launched a trial run of its first high voltage direct current (HVDC) transmission line with the full load of 4,000 MW.