![Klaipeda substation ready for connection with NordBalt](https://transform.zgisoft.com/files/6ac120fd0b4b143822d7f317faca5711-340x210.jpg)
Klaipeda substation ready for connection with NordBalt
Lithuania, Klaipeda: After a three-year reconstruction, the new equipment and advanced control systems have been installed in Klaipeda transformer substation which is now ready to be connected with NordBalt power interconnection.