#turbines


Seamade substation leaves for Rotterdam

Belgium: The first offshore substation transition piece and J-tube cage for the 487 MW Seamade offshore wind farm off Belgium are being transported to the Sif terminal in Rotterdam in the Netherlands ahead of installation.

$43 M wind farm to be built in Scotland

Work on a $43 M wind farm on Inverclyde’s hillside will start next week and the BayWa R.E. will start building eight 110 m tall turbines in the hills above Greenock and the Port.