#330 kV


Klaipeda substation ready for connection with NordBalt

Lithuania, Klaipeda: After a three-year reconstruction, the new equipment and advanced control systems have been installed in Klaipeda transformer substation which is now ready to be connected with NordBalt power interconnection.

Elektrozavod ships new transformers to Leningrad NPP 2

Russia, Leningrad Oblast: The Russian transformer factory Elektrozavod has manufactured modular single-phase transformers of 533 MVA, 330 kV for Leningrad Nuclear Power Plant 2 following the order by Rosenergoatom operating the power plant.