400 MW PV plant planned in Gujarat
The plant will be bulit in Surendranagar, Gujarat, fitting with India’s plan to build at least 500 GW of non-fossil fuel energy output by 2030.
The plant will be bulit in Surendranagar, Gujarat, fitting with India’s plan to build at least 500 GW of non-fossil fuel energy output by 2030.
The China-based Asian Infrastructure Investment Bank, has approved a loan of $120 M to upgrade and expand the power transmission system in Chattogram.