Adrar wind farm to be tested
The construction of the Adrar wind farm, Algeria which commenced in 2011, is making good progress. Testing of the wind turbines is scheduled for December 2013.
The construction of the Adrar wind farm, Algeria which commenced in 2011, is making good progress. Testing of the wind turbines is scheduled for December 2013.