SRP’s two grid-charged battery systems
The systems will add 340 MW/1360 MWh of additional battery storage capacity to SRP’s system.
The systems will add 340 MW/1360 MWh of additional battery storage capacity to SRP’s system.
USA, Mesa: Salt River Project (SRP) has announced a half-mile 230 kV transmission line and substation to serve energy to a data centre.
The power transmission infrastructure developer submitted bids for two battery energy storage projects, with a cumulative capacity of 400 MW,