Preferred route for VNI West project unveiled
Transgrid has released details of its preferred route for the northern portion of the VNI West interconnector that will connect the New South Wales and Victoria grids.
Transgrid has released details of its preferred route for the northern portion of the VNI West interconnector that will connect the New South Wales and Victoria grids.
Global breakbulk and project heavy lift carrier AAL has delivered a 305-tone Toshiba transformer to the Stockyard Hill Wind Farm in Victoria.
Authorities say much needed energy won’t be able to reach the grid without major upgrades to networks in rural Victoria.
Australia, Victoria: The biggest single component of the Ararat wind farm, the USD 300 million (AUD 400 million) project in south-west Victoria, arrived to Australia from Shanghai and was travelling through Elmhurst last week on its way to the site.
Australia, Victoria: Two purpose-built transformers will arrive at the Ararat Wind Farm substation in south-west Victoria this week, marking a significant milestone for the USD 300 million (AUD 400 million) project.